Question No: 1 – (Topic 1)

You are posting a purchase receipt for a subcontracted service as part of a Lean production flow in Microsoft Dynamics AX 2012. To which ledger accounts does the transaction post?

  1. Liability and Raw Material Inventory

  2. Liability and Work In Process (WIP)

  3. Raw Material Inventory and Work In Process (WIP)

  4. Raw Material Inventory and Variance

Answer: B

Reference:http://dynamicscare.com/blog/index.php/activity-based-subcontracting/

Question No: 2 – (Topic 1)

Components have been consumed by a production flow.

When the backflush costing process is run at the end of a period, in what order are the consumed components processed?

  1. transaction quantity order

  2. receipt date order

  3. FIFO order

  4. LIFO order

Answer: C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 38.

Question No: 3 – (Topic 1)

When does the Capable to Promise (CTP) functionality allow the user to see the availability of products in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose two.)

  1. in a batch job after the sales order lines are entered.

  2. When a scheduled Kanban is generated.

  3. Automatically when an order is entered.

  4. After the View pegging tree requirement is selected on the sales order.

Answer: B,D

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing:Kanban and Pull Based Manufacturing, White Paper, July 2011, p 35.

Question No: 4 – (Topic 1)

Which cost is used to estimate the cost contribution of a subcontracted activity in Microsoft Dynamics AX 2012 Lean manufacturing?

  1. zero cost

  2. the standard cost of the service product used to purchase the subcontracted service

  3. the last cost of the service product used to purchase the subcontracted service

  4. the amount from the purchase agreement line used to purchase the subcontracted service

Answer: B

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 45.

Question No: 5 – (Topic 1)

What is required to firm a planned order of type Kanban in Microsoft Dynamics AX 2012?

  1. an event Kanban rule

  2. a Kanban line rule

  3. a fixed Kanban rule

  4. a scheduled Kanban rule

Answer: D

Reference:

http://dynamicscare.com/blog/index.php/scheduling-kanbans-in-ax2012/

Question No: 6 – (Topic 1)

You need to ensure that a new Kanban of the same type will be created whenever the material handling unit associated with a Kanban is emptied.

Which replenishment strategy should you use?

  1. Event

  2. Scheduled

  3. Fixed Quantity

  4. Stock Transfer

Answer: C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p 7.

Question No: 7 – (Topic 1)

Which Lean principle focuses on maximizing value-added content, minimizing waste, and quickly adding value?

  1. pull

  2. Flow

  3. Customer Value

  4. Perfection

Answer: C

Question No: 8 – (Topic 1)

Which of the following functions are performed by production flows? (Each correct answer presents a complete solution. Choose three.)

  1. Outline the process and transfer activities of the Value Stream.

  2. Support the Kanban rules in defining the activities for a Kanban.

  3. Specify an activity-based framework for the planning and production processes.

  4. Provide a basic structure for planning, tracking, and processing orders based on pull signals from the customer.

  5. Set the pace of production based on the rate of demand from the customer.

Answer: A,B,C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p6-10.

http://technet.microsoft.com/en-us/library/hh527161.aspx

Question No: 9 – (Topic 1)

You are setting up the following three process activities in a production flow in Microsoft Dynamics AX 2012:

  • The first process activity picks the bill of materials (BOM) components and outputs a semi-finished product.

  • The second process activity picks the semi-finished product from the first activity and outputs a different semi-finished product than the first activity.

  • The third process activity picks the semi-finished product from the second activity and

outputs a finished product.

How should you configure the first process activity?

  1. To update the on-hand receipt and not receive the semi-finished product

  2. To update the on-hand receipt and receive the semi-finished product.

  3. To receive the semi-finished product and not update the on-hand receipt.

  4. To not receive the semi-finished product and not update the on-hand receipt.

Answer: C

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 27.

Question No: 10 – (Topic 1)

Which statement about a withdrawal Kanban in Microsoft Dynamics AX 2012 is true?

  1. A withdrawal Kanban is planned.

  2. A withdrawal Kanban is visible on the Kanban schedule board.

  3. A withdrawal Kanban creates a process activity.

  4. A withdrawal Kanban moves the Kanban of an item between warehouses.

Answer: D

Reference:

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p6.

100% Ensurepass Free Download!
Download Free Demo:MB6-884 Demo PDF
100% Ensurepass Free Guaranteed!
MB6-884 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No