[Free] 2018(Jan) Dumps4cert Braindumps IBM C2140-820 Dumps with VCE and PDF Download 11-20

Dumps4cert.com : Latest Dumps with PDF and VCE Files 2018 Jan IBM Official New Released C2140-820
100% Free Download! 100% Pass Guaranteed!
http://www.Dumps4cert.com/C2140-820.html

Rational Team Concert V4

Question No: 11

A customer expects a work item with an appropriate quot;Planned forquot; attribute to show on a team#39;s iteration plan, but the work item is missing from the plan view. What is the most likely reason?

  1. The work item#39;s owner is unassigned.

  2. The work item#39;s owner is not part of the team owning the plan.

  3. The work item#39;s Filed Against category is not associated to the team owning the plan.

  4. The work item#39;s due dateis set to a date after the iteration#39;s end date.

Answer: C

Question No: 12

What is associated with a project area and is a collection of practices, rules, and guidelines?

  1. process

  2. Team area

  3. work item

  4. rule set

Answer: A

Question No: 13

Which three Rational Team Concert clients support reporting? (Choose three.)

  1. RTC client for Microsoft Visual Studio IDE

  2. RTC web client

  3. RTC Eclipse client

  4. RTC context-aware search tool

  5. RTC commande-line interface

Answer: A,B,C

Question No: 14

What does the filled-in shape icon shown below indicate in Team Artifacts view?

  1. Files in that component have been checked out.

  2. All files from that component have been loaded into a local sandbox.

  3. There are incoming changes in thatcomponent.

  4. There are outgoing changes in that component.

Answer: B

Question No: 15

A work item appears in a plan when which two conditions are met? (Choose two.)

  1. The Filed Against field has the work item category linked to the team area that ownsthe plan.

  2. The Due Date field of the work item is on or before the end date of the plan.

  3. The work item is assigned to a member of the team that owns the plan.

  4. The Planned For field in the work item matches the Iteration field of the plan.

  5. The work item is created by a member of the team area that owns the plan.

Answer: A,D

Question No: 16

Which two build types are supported with Rational Team Concert? (Choose two.)

  1. personal builds

  2. composite builds

  3. public builds

  4. parallel builds

Answer: A,C

Question No: 17

Which three work item types appear by default in the Scrum template? (Choose three.)

  1. epic

  2. milestone

  3. defect

  4. retrospective

  5. sprint

Answer: A,C,D

Question No: 18

What are three notification mechanisms in RationalTeam Concert? (Choose three.)

  1. email notification

  2. Short Message service

  3. feed of changes

  4. pop-up alerts

  5. blog

Answer: A,C,D

Question No: 19

A team wants to benefit from synchronous collaboration by using instant messaging. Which statement istrue about Rational Team Concert support for instant messaging?

  1. Rational Team Concert does not integrate with instant messaging tools.

  2. Teams can use chat features only if they are using the IBM Sametime instant messaging product.

  3. Rational Team Concert provides instant messaging capabilities, and no other tool is needed to initiate chats.

  4. Teams members can initiate chats when they configured Rational Team Concert to integrate with an instant messaging tool

Answer: D

Question No: 20

In theEclipse client, which statement best describes the Event Log?

  1. It displays all the precondition actions for source control actions.

  2. It shows information delivered by news feeds.

  3. It provides a simplified interface to create new defects.

  4. It is used to create new events for a project team.

Answer: B

100% Dumps4cert Free Download!
Download Free Demo:C2140-820 Demo PDF
100% Dumps4cert Free Guaranteed!
C2140-820 Dumps

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No