[Free] 2017(Sep) Latesttests Passguide IBM C2020-701 V13 Dumps with VCE and PDF 1-10

Latesttests 2017 Sep IBM Official New Released C2020-701 V13
100% Free Download! 100% Pass Guaranteed!
http://www.Latesttests.com/C2020-701 V13.html

IBM Cognos TM1 10.1 Analyst

Question No: 1

Whywould you use Rebuild over Recalc in an Active Form?

  1. When a conditional format on a report changes

  2. When metadata is added to the TM1 model that must be displayed on the row

  3. When data changes along the rows of a report

  4. When a leaf element is added to a consolidated element of a report

Answer: B

Question No: 2

You are asked to prepare next year#39;s budget for your organization. Because of budgetary pressures for the new year, you are instructed to copy last year#39;s budget into the new year and reduce it by 5%. The TM1 cube you are using contains last year#39;s budgetary data and the new year element has been added.

Which two TM1 data spreading operations will allow you to do this? (Choose two.)

  1. Proportional Spread followed by Percent Change

  2. Relative Percent Adjustment

  3. Relative Proportional Spread followed byPercent Change

  4. Relative Proportional Spread followed by Relative Percent Adjustment

Answer: C,D

Question No: 3

A user would like to export data from a TM1 Web Cube View so that subsequent data changes on the TM1 server will not affect the exported data.

Which two export options should the user select? (Choose two.)

  1. Slice to Excel

  2. Snapshot to Excel

  3. Export to PDF

  4. Slice to Active Form

Answer: B,C

Question No: 4

Click the Exhibit button.

Latesttests 2017 PDF and VCE

In the Assumptions dimension all key figures are formatted correctly as shown in the exhibit, yet all values are displayed as currency.

Wherewould you search for the currency format?

  1. In the title dimensions

  2. In the other row dimension

  3. In the column dimensions

  4. In the cube format

Answer: C

Question No: 5

A user wants to update TM1 data within a Microsoft Excel worksheet. What are the three ways to do this? (Choose three.)

  1. Create an Active Form from within TM1 Cube Viewer.

  2. Createa Snapshot from within TM1 Cube Viewer.

  3. Create a Sandboxfrom within TM1 Cube Viewer.

  4. Select In-Spreadsheet Browser from within TM1 Perspectives.

  5. Create an Excel Slice from within TM1 Cube Viewer.

Answer: A,D,E

Question No: 6

An international company has an existing TM1 server application they use for planning, forecasting, and reporting. The corporate strategydepartment wants to share parts of this application with external consultants and partners. They decide to create Cognos Insight workspaces which includes data from this server application combined with additional analysis and content. They intend to distribute a single workspace quot;.cddquot; file to the recipients.

How should they integrate the TM1 server data with additional content resulting in distributable Cognos Insight workspace files?

  1. Connect to the server using Distributed Mode, save the workspace and then modify as needed.

  2. Drag and drop TM1 cube views and subsets into the workspace, save the workspace and then modify as needed.

  3. Connect to the server using Connected Mode, save the workspace and then modify as needed.

  4. Import TM1 cube views and subsets, save the workspace and then modify as needed.

Answer: D

Question No: 7

There has been a number of requests by users to have an option to easily select quartersfor their views, rather than having to select the individual quarters every time they go into their views.

Which solution meets this requirement?

  1. A new public view should be created.

  2. A new private subset should be created.

  3. A new public subsetshould be created.

  4. A new alias should be created.

Answer: C

Question No: 8

An end user wants to interactively create a temporary consolidation that does not exist within the dimension using the TM1 Cube Viewer.

Which action will accomplish this?

  1. Create a user defined subset and the roll up takes place automatically.

  2. Create a user defined subset and use the Roll Up function.

  3. Create a roll up set and insert into a user defined subset.

  4. Create a roll up set and insert into a dynamic subset.

Answer: B

Question No: 9

The manufacturing department interacts with IBMCognosTM1 data using TM1 Perspectives. They want to view data by product and location. Products are on the rows of the analysis and plants are on the columns. Products are consolidated into categories and locations are consolidated into regions.

Which twointerfaces allow them to expand and collapse on both the rows and columns of the analysis? (Choose two.)

  1. Active Form

  2. Cube Viewer

  3. In-Spreadsheet Browser

  4. Excel Slice

Answer: B,C

Question No: 10

What is the differencebetween a TM1 Sandbox and a Personal Workspace?

  1. A Personal Workspace allows you to work in a private area where a Sandbox is shared.

  2. A Personal Workspace is a special default unnamed Sandbox where you begin your work.

  3. A Personal Workspace is shared.

  4. A Personal Workspace does not require you to commit your data as a Sandbox does.

Answer: B

100% Free Download!
Download Free Demo:C2020-701 V13 Demo PDF
100% Pass Guaranteed!
Download 2017 Latesttests C2020-701 V13 Full Exam PDF and VCE

Latesttests ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 Latesttests IT Certification PDF and VCE