Question No: 191 – (Topic 2)

You work as a project manager for PassGuide Inc. You want to include a budget contingency to accommodate the risk of incurring unidentifiable but normally occurring costs within the defined scope. Which of the following processes will help you to accomplish the task?

  1. Cost controlling

  2. Cost baselining

  3. Cost budgeting

  4. Cost estimation

Answer: B

Question No: 192 – (Topic 2)

In which of the following forecasting techniques is an attempt made to develop forecasts through group consensus?

  1. Time series method

  2. Casual/econometric method

  3. Delphi technique

  4. Judgmental forecasting method

Answer: C

Question No: 193 – (Topic 2)

Which of the following contract types is described in the statement below?

quot;This contract type provides no incentive for the contractor to control costs and hence is rarely utilized.quot;

  1. Cost Plus Fixed Fee

  2. Cost Plus Award Fee

  3. Cost Plus Percentage of Cost

  4. Cost Plus Incentive Fee

Answer: C

Question No: 194 – (Topic 2)

Kelly is the project manager of her organization. She is reviewing the project network diagram to confirm that the resource she has identified is available to complete the project assignments without conflicting with other activities in the project node. The availability of resources will help Kelly determine the final finish date for the project. What scheduling technique is Kelly using?

  1. Critical Path method

  2. Critical Chain method

  3. Resource utilization

  4. Resource leveling heuristics

Answer: B

Question No: 195 – (Topic 2)

Which of the following methods tends to keep the resources levelly loaded, but requires the resources to be flexible in their start times and to quickly switch between tasks and task chains to keep the whole project on schedule?

  1. Critical Chain method

  2. Critical Path method

  3. Resource utilization

  4. Resource leveling heuristics

Answer: A

Question No: 196 – (Topic 2)

Which of the following is a formal documentation that indicates the completion of the project or phase and the transfer of the completed project deliverables to the operations group or to the next phase?

  1. Project handover report

  2. Stakeholder register

  3. Risk register

  4. Project charter

Answer: A

Question No: 197 – (Topic 2)

In which of the following processes are the results of executing the quality activities recorded and monitored in order to assess performance and recommend necessary changes?

  1. Perform Quality Control

  2. Plan Quality

  3. Control Cost

  4. Perform Quality Assurance

Answer: A

Question No: 198 CORRECT TEXT – (Topic 2)

Fill in the blank with the appropriate term.

A specifies the sequence and number of letters or numbers required for each level

and the symbol separating the levels in a work breakdown structure (WBS) code or a custom outline code.

Answer: code mask

Topic 3, Volume C

Question No: 199 – (Topic 3)

You are the project manager of the GYG Project. A new scope change is being considered for your project. You are concerned, however, that the scope change may add costs, risks, and adversely affect the project schedule. What project management process is responsible for evaluating the full effect of a proposed scope change on your project?

  1. Schedule change control

  2. Scope change control

  3. Change Control Board approval process

  4. Integrated change control

Answer: D

Question No: 200 – (Topic 3)

You work as a project manager for PassGuide Inc. Which of the following processes will you use to aggregate the probable costs of individual activities or work packages to set up an authorized cost baseline?

  1. Estimate costs

  2. Control costs

  3. Determine Budget

  4. Plan quality

Answer: C

100% Free Download!
Download Free Demo:GCPM Demo PDF
100% Pass Guaranteed!
Download 2017 CollectDumps GCPM Full Exam PDF and VCE

CollectDumps ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 CollectDumps IT Certification PDF and VCE