[Free] 2017(Nov) Latesttests Passguide IBM C9030-622 Dumps with VCE and PDF Download 11-20

Latesttests 2017 Nov IBM Official New Released C9030-622
100% Free Download! 100% Pass Guaranteed!
http://www.Latesttests.com/C9030-622.html

System z Business Resiliency Solution Selling

Question No: 11

Which of the following actions will have the greatest impact on future zEnterprise business recovery processes?

  1. Implementing I/T optimization

  2. Planning for GDPS Active/Active solution

  3. Using zBX for distributed server recovery

  4. Implementing a Cloud on System z solution

Answer: B

Question No: 12

A customer is debating which platform to choose to run their new application workload. Which of the following will assist customer to confirm their platform of choice?

  1. CP3000 study

  2. Fit for Purpose (FFP) study

  3. High Availability assessment

  4. Application design review workshop

Answer: B

Question No: 13

What type of coupling links are required to support distances greater than 10 KM?

  1. ICM3

  2. ICB4

  3. PSIFB LR 1x

  4. PSIFB SR 12X

Answer: C

Question No: 14

Which of the following most completely determines the cost of an outage?

  1. Damage to market reputation

  2. Loss of loyal customer business

  3. Reduction in worker productively

  4. Lost revenue and recovery expenses

Answer: D

Question No: 15

A customer is implementing a GDPS/PPRC solution and is concerned about building skills for their staff. Which of the following is an appropriate response?

  1. IBM Tivoli System Automation Manual

  2. IBM Lab Services provides transition staffing

  3. System zTechnical events offer customized instruction

  4. Transition education is included in a typical services solution

Answer: D

Question No: 16

Consider the following configuration:

-> 2 zEnterprise CECs in a production environment

-> 1 z10-EC at a DR site

Cobol applications have been upgraded to zEnterprise Cobol for z/OS on the production system. What is the impact to the Cobol applications in the event of a disaster?

  1. The z10-EC is out of support and will not run Cobol programs.

  2. The programs may not run due to differences in the hardware instruction sets.

  3. The programs will run in a degraded state due to the speed differences in the CECs.

  4. The z10-EC will run zEnterprise Cobol using the Bimodal Migration offering.

Answer: B

Question No: 17

A customer has production and backup data centers with equipment installed to support both mainframe and distributed systems.

Considering projected growth, the customer will not be able to have enough electrical

power at the backup data center. Which is the most cost effective action?

  1. Relocate the backup data center.

  2. Install auxiliary electrical generators.

  3. Request a server consolidation study.

  4. Install more energy efficient equipment.

Answer: C

Question No: 18

A customer has a VSAM application that requires High Availability.

An evaluation of the application and environment should discover which base components?

  1. GRS Ring Coupling Facility Server Time Protocol

    Application Owning Regions

  2. Parallel Sysplex Function Shipping Server Time Protocol Record Level Sharing

  3. GRS Star Parallel Sysplex Coupling Facility

    Server Time Protocol Record Level Sharing

  4. Lock Structures Parallel Sysplex Coupling Facility Cache Structures Server Time Protocol

Answer: B

Question No: 19

A customer is documenting their Disaster Recovery process, and is considering all aspects of running the business. The following elements have been identified as essential:

-> Secondary data center location and equipment

-> Key responsibilities of critical business units

-> Up-to-date emergency contact information for all staff

In addition to these elements, which personnel should be listed as essential to be actively engaged in the event of a disaster?

  1. Mid-level management Storage administrators

    Application development programmer(s) Network administrator(s)

  2. System programmer(s)

    Performance and capacity management team Network administrator(s)

    Operations analyst

  3. Workload schedulers System operator(s) Storage administrator(s)

    Disaster Recovery Manager

  4. Database administrator(s) System programmer(s) Network administrator(s) Disaster Recovery manager

Answer: D

Question No: 20

A customer’s service level agreement has the following components and configuration characteristics:

-> RTO=24 hours

-> RPO=1 hour

-> Flash Copy to a single set of disks at a remote site

-> Tape backup once per day

What would be the state of the data if a disaster occurred during a resynchronization process?

  1. There would be some data loss, but the data would need to be resynchronized.

  2. There would be some data loss, but RPO and RTO would support service level

    agreements.

  3. The data would be unreliable and their RTO and RPQ would exceed service level agreements.

  4. The data would be reliable with the tape backup, and support the RTO, but the RPO would exceed service level agreements.

Answer: C

100% Free Download!
Download Free Demo:C9030-622 Demo PDF
100% Pass Guaranteed!
Download 2017 Latesttests C9030-622 Full Exam PDF and VCE

Latesttests ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 Latesttests IT Certification PDF and VCE